1 / 5
Model No. : | LB2000 |
---|---|
Brand Name : | Andere |
Type : | Asphalt Mixing Plant |
Harbin, Heilongjiang, China
Produktbeschreibung
Asphalt-Mischtrommelmischer-Anlage Speco
• Kosteneffektive Lösungen für Ihr Projekt
• Wartungsarmer Betrieb, geringer Energieverbrauch und geringe Emissionen
• Optionales Umweltdesign - Folien und nach Kundenwunsch verkleidet
• Multi-Fuel-Brenner zur Auswahl
Name | Technical Parameters | |||
Type | QLB-600 | QLB-1000 | QLB-1500 | QLB-2000 |
Production capacity | 48t/h | 80t/h | 120t/h | 160t/h |
Volume of cold aggregate bin | 8m³/3 | 9m³/3 | 10m³/4 | 10m³/5 |
Dust collect type | Air back flush/wet dust collect | |||
Dust collect efficiency | ≤30mg/Nm³ Ringelmann scale level 1 | |||
Fuel type | Diesel /Heavy diesel /Coal power/Gas | |||
Volume/number of hot bin | 12t/4 | 32t/4or5 | 40/4or5 | 50t/5 |
Measuring accuracy of aggregate | <+1.5% | <+1.0% | ||
Measuring accuracy of filier | <+1.5% | <+1.0% | ||
Measuring accuracy of bitumen | <+0.5% | |||
Mixing capacity kg/batch | 600 | 1000 | 1500 | 2000 |
Volume / number of asphalt tank | 10m³/2 | 10m³/2 | 30m³/2 | 50m³/2 |
Finished bin volume (t) | 60 | 100 | 120 | |
Total power(kw) | 185 | 248 | 345 | 470 |
Control system | Full auto computer control(PLC+LCD+mouse |
F: Wie viele Mitarbeiter werden benötigt, um eine Asphaltanlage zu betreiben?
A: 1 Bediener des Laders, 1 Mechaniker, 1 Elektriker, 1 Supervisor, 1 Bediener der gesamten Anlage.
F: Wie viele Tage werden für die Installation einer Asphaltanlage verwendet?
A: Ungefähr 20-30 Tage, je nach lokaler Situation.
F: Bieten Sie im Ausland Montage- und Schulungsservice an?
Q: wie lang ist die lieferzeit?
A: 30-40 Tage, je nach Konfiguration. Wir versprechen pünktliche Lieferung.
Q: Können Sie mir einige Ersatzteile frei schicken?
A: Einige Ersatzteile werden Ihnen zusammen mit Asphaltanlagen kostenlos zugesandt.
Q: Kann ich ihre fabrik besichtigen?
Harbin, Heilongjiang, China
Senden Sie Ihre Anfrage an diesen Lieferanten